What's Being Built at Main and River Road
Midway is about to become a two-stoplight town. Construction is underway on a new traffic signal at the intersection of Main Street (S.R. 113) and River Road (400 E) — the town's primary access point from the north and east.
What's changing
Along with the new four-way signal, the intersection will gain dedicated turn lanes, new crosswalks, bike lanes, and curb and gutter work. UDOT says the upgrade has been in the works for a couple of years, driven by growing traffic demand as Midway has become more of a destination, thanks in part to Main Street draws like Ballerina Farm and the local theater.
What it means for residents
Expect reduced speeds, occasional lane shifts, and 5 to 10 minute delays during weekday daytime construction hours, with some Saturday work as needed. Pedestrian access stays open throughout, and two-way travel resumes during non-working hours. The project carries a price tag of roughly $7.5 million and has a targeted completion date this August.
This is Midway's first new stoplight since 2017, when the Main and Center intersection got its signal. For live construction updates, the city posts details at midwaycityut.gov under City Projects.